Product details
Model Number: TOP-151109-10-R
Brand Name: TOPWELL
Key Specifications/Special Features:
Packing/shipping:For mold: after assemble and clean the mold, we paint anti-rust fog or grease on mold, then cover it with thin film and place it into a stable wooden boxFor plastic product: first thing is to wrap each part up with semi-transparent thin foam and put it into plastic bag, the second step is place them into cartons with thin sponge plates to prevent scratchesDelivery lead-time: fast lead time about 20 days, 3 shifts, on time deliveryOur services: specialize in making plastic injection mould, die casting mould, stamping mould, electronic product, automotive product, home appliance and medical products
Advantages:
- Topwell was incorporated in 1996, has evolved to be one of the leading customer injection molders of our region
- Can provide one-stop service to satisfy our customer, including make DFM report, mold flow analysis, part and mold design, high-quality mold machining, good parts, silkscreen, spraying, sandblasting and good after-sale service, whatever our customer need, we'll try our best to reach it
- Have enough capability of injection molding machine to meet the requirements if the customer needs mass production
Mold name | Injection plastic product |
Mould shaping | Plastic injection mould |
De-mould type | Automatic eject/with robot hand |
Mould base | LKM, Hasco and DME |
Mould material | NAK80, S136, 2316, 2738, H13, 5CrNiMo, 718H, P20, 40Cr, 60#, 45# |
Mould cavity | Single or multi, as your requirements |
Sprue gate | YUDO runner, hot runner, cold runner, Pin-point gate, Submarine gate |
Design software | UG, PROE, CAD, CAXA |
Plastic material | PP, PC, PS, PA6, POM, PE, PU, PVC, ABS, PMMA |
Mould life | 300000~+1,000,000 shots |
Delivery time | 15-30 days |
Payment terms | T/T |
Packaging | Wooden cases |
Transportation | By Sea or by air, as your requirement |
Export country | Worldwide |
Specification | As your requirement |
OEM order | welcome |
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 30 - 40 days
Main Export Markets:
- Australasia
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe